BEFORE
42'' DIP 20 LF + Depth Newly Installed
Miss Aligned Joints One Leaking @ 10 LF & @ 30 LF
No Option to Dig & Repair
Call Jeff for Quote 910-520-5160
AFTER
42'' DIP 20 LF + Depth Newly Installed
Only Option Was Fiberglass TPR
Less Than 1/8'' in Thickness
The Fiberglass TPR Will Adhere to the Host Pipe & Stop the Leak
Call Jeff for Quote 910-520-5160
Before
Same Job
42'' DIP 20 LF + Depth Newly Installed
Missed Align Joints this one Leaking @ 10 LF
Again, no Option to Dig & Repair
Call Jeff for Quote 910-520-5160
After
42'' DIP 20 LF + Depth Newly Installed
Only Option Was Fiberglass TPR
Less Than 1/8'' in Thickness
The Fiberglass TPR Will Adhere to the Host Pipe & Stop the Leak
We Installed a Total of 8 each 42'' TPR
Call Jeff for Quote 910-520-5160
18'' RCP With Offset That Caused a Sink Hole Next to Street in Cary,N.C.
Created a Hazard for Pedestrian's,Pets Walking the Neighborhood
See Below Method of Repair
Call Jeff for Quote @ 910-520-5160
Method of Repair
No Dig Fiberglasss Trenchless Point Repair 18'' x 48''
When you have Under Ground Power Lines,Gas Lines,Water Lines Communication Lines this is the Best Method Repair.
The Fiberglass TPR Adheres to the Host Pipe Making this a Water Tight Repair
Call Jeff for Quote @ 910-520-5160